High-Accuracy Earthwork Measurement Drone – Revolutionizing Construction Surveying

Advanced UAV Solution for Earthwork Quantification and Progress Monitoring

Core Features

  • RTK/PPK Positioning System: 1cm vertical accuracy for precise cut/fill calculations
  • High-Frequency Survey Capability: Daily site progress monitoring
  • Automated Volumetric Reporting: Direct export to Trimble, AutoCAD Civil 3D formats
  • Long Endurance Operation: 60+ minutes per flight, covering 50-100 acres

Performance Specifications

Parameter Moneypro EM-500 Standard Surveying Drone
Vertical Accuracy 1cm (with RTK) 3-5cm
Volumetric Error Rate <0.5% 1.5-2%
Max Daily Coverage 500 acres 150 acres
Data Processing Time 15 minutes (automated) 2-4 hours

Cutting-Edge Technologies

AI-Powered Volume Calculation

  • Deep learning algorithms for material classification (soil, rock, stockpile)
  • Automatic change detection between surveys
  • Predictive earthwork balancing suggestions

Advanced Sensor Suite

  • High-res RGB camera with global shutter (42MP)
  • Optional LiDAR payload for dense vegetation penetration
  • Multispectral imaging for material moisture analysis

Military-Grade Positioning

  • Anti-jamming GNSS receivers for challenging environments
  • Dual-antenna RTK for precision in high-slope areas
  • Local grid coordinate system support

Key Market Applications

Civil Engineering & Construction

  • Real-time cut/fill monitoring for road construction
  • Progress tracking for large-scale earthmoving projects
  • As-built verification vs. design models

Mining & Quarry Operations

  • Daily reserve volume calculations
  • Stockpile management and inventory control
  • Reclamation progress monitoring

Infrastructure Development

  • Dam construction surveying
  • Railway embankment measurement
  • Landfill capacity management

Industry Advantages

Operational Efficiency

  • 80% reduction in surveying time vs. traditional methods
  • 60% cost saving on earthwork measurement
  • Elimination of ground control points

Data Integration

  • Seamless BIM/GIS compatibility
  • PDF/Excel report auto-generation
  • Cloud-based collaboration platform

Case Studies

Highway Construction Project (Shanxi Province)

  • Reduced surveying time from 3 days to 2 hours
  • Identified 5,200m³ of unaccounted material movement
  • Saved $120,000 in survey costs over project duration

Open-Pit Mine (Inner Mongolia)

  • Daily production volume monitoring
  • 99.2% accuracy in ore reserve calculations
  • ROI achieved in 17 days of operation

Technical Specifications

  • Max Flight Time: 68 minutes
  • Operating Temperature: -20°C to 50°C
  • Wind Resistance: 12 m/s
  • Payload Options: RGB, LiDAR, multispectral
  • Data Outputs: CSV, DXF, LandXML

Related projects